Geoecology
Contact: Dr. M. Schönau
E-mail: GOEk-utec.de
Phone: + 49 3632 610 130
Fax: + 49 3632 610 105
Services
- Consulting on Environmental Affairs
- Consulting/expert opinions on environmental matters
- Surveys on environmental compatibility
- Concepts and implementation plans as well as plans on green areas in the sector of landscape design
- Ecological and geotechnical monitoring of construction sites
- Authorization Procedures
- Application documents for area management and preliminary planning procedures
- Application documents for authorization procedures (according to the laws of water protection, nature conservation, emission protection and construction)
- Operation plans according to the federal laws on mining (frame operation plans, main operation plans, special operation plans and . nal operation plans)
- Processing of Residue
Step 1 – Registration / Historical Exploration
- Evaluation of aerial photos and other historical documents
- Interrogation of time-witnesses
- Reconstruction of the previous utilization of the area to be explored
Step 2 – Evaluation of Endangering Factors
- Exploration for relevant information
- Detailed explorations
Step 3 - Redevelopment/Recultivation and Surveillance
- Exploration of facilities for redevelopment and recultivation
- Development of concepts for redevelopment and recultivation
- Expert consulting on ecological recultivation
- Implementation of self-controlling measures
- Interdisciplinary Research Work
- Management of the Unstrut river basin area
- Measurement of the soil-damp in root areas
- Damp-measurement in salt-loaded matrices
- Material release in soil substitutes
- Methods of evaluating resist coatings
- Soil water regime models for dumps and deposits
- Bleicherode lysimeter station
![]() Ramming core sounding to the sampling | ![]() Admission of a drillcore | |
Technology
- State-of-the-art Drilling Equipment:
- Ramming sounding equipment / drilling device RSB 0/1.4-88, Ramming core probes up to a ø 80 mm, Hollow bore corner ø 185 mm
- Pneumatic hammers COBRA and BOSCH
- Land Surveying:
- In-clock reading plate loading test
- Technology for registrating In - situ parameters (temperature, pH-value, conductivity, 02-content, redox tension)
- Damp measurement technology, damp measuring probes ML2 and PR1 Tensiometer for direct regulation and logger operation
- In. ltrometer (bed and ring-in. ltrometers and open-end-test)
- Weather station (Thies Company)
- Sampling Technology:
- Equipment for soil sampling (RKS, sampling wells, Headspace)
- Equipment for water sampling (various stainless steel scoops, sampling scoops for samples in deeper layers, various sampling pumps down to a maximum depth of 90 meters)
- Equipment for soil air sampling (gas bags, gas mice, headspace, FID as direct measuring)
![]() Drilling equipment during the investigation of refuse dumps | ![]() Drilling equipment in the field operation | |
References
- Exploration of contaminated sites and preparatory measures for redevelopment on the factory grounds of the Rositz tarprocessing company and the disposal site ”Germania”
UmweltministeriumThuringia/Germany - First evaluation of all saline deposits at the locations of the former combined enterprise Kombinat KALI
Mitteldeutsche Kali AG/Germany - Systematic solutions for salt freight control and ecologically compatible salt freight regulation within the Thuringian river
systems
GVVmbH/Germany - Pilot project Bleicherode – Development of a recultivation process of contaminated dumps
GVVmbH Erfurt and Deutsche Bundesstiftung Umwelt Osnabrück/Germany - Final report on the implementation of a lysimeter experiment on the Bleicherode potash dump
Thüringer Landesanstalt für Landwirtschaft Jena/Germany - Preparation and consulting on the recultivation of the factory grounds of COTTANA Textil GmbH
Stadtverwaltung Mühlhausen and Grundstücksgesellschaft zur Altlastensanierung – Mühlstraße, In
der Klinge and Im Flarchen/Germany - Derivation of tolerable sulphate concentrations in flowing waters
influenced by mining under ecological and economic aspects
WISMUT GmbH/Germany - Survey on the compatibility with the environment of the project ”Erection of a biomass combined heat and power station in the
business park of Siegerland-Airport” (research into animals and plants as protected property)
TÜV Thüringen Anlagentechnik GmbH/Germany - Accompanying plan (landscape design) for repairing the dikes of Helderbach, Langenrodaer Bach, Wiehscher Bach and Nausitz Mühlgraben (creeks in Northern Thuringia)
Staatliches Umweltamt Sondershausen/Deutschland - Ecological monitoring of the ”Freeing of the river Wipper from floodwater within the town of Sondershausen”
GVVmbH and Staatliches Umweltamt Sondershausen/Germany - Production of managing tools for the water management under the conditions of saline entries within the drainage area of the
upper and middle part of the river Unstrut
Part 4 of a project: Explorations of the salt load entry of the area affected by 5 big potash residue dumps in the south of the Harz
Mountains (material entries)
Dresdner Grundwasserforschungszentrum e.V./Germany
![]() river training of the river Wipper Sondershausen 26.04.2004 | ![]() river training of the river Wipper Sondershausen 08.06.2004 | |













