Geoecology

Contact: Dr. M. Schönau
E-mail: GOEdont-like-spam.k-utec.de
Phone: + 49 3632 610 130
Fax: + 49 3632 610 105

Services

  • Consulting on Environmental Affairs
  • Consulting/expert opinions on environmental matters
  • Surveys on environmental compatibility
  • Concepts and implementation plans as well as plans on green areas in the sector of landscape design
  • Ecological and geotechnical monitoring of construction sites
  • Authorization Procedures
  • Application documents for area management and preliminary planning procedures
  • Application documents for authorization procedures (according to the laws of water protection, nature conservation, emission protection and construction)
  • Operation plans according to the federal laws on mining (frame operation plans, main operation plans, special operation plans and . nal operation plans)
  • Processing of Residue

               Step 1 – Registration / Historical Exploration

  • Evaluation of aerial photos and other historical documents
  • Interrogation of time-witnesses
  • Reconstruction of the previous utilization of the area to be explored

               Step 2 – Evaluation of Endangering Factors

  • Exploration for relevant information
  • Detailed explorations

               Step 3 - Redevelopment/Recultivation and Surveillance

  • Exploration of facilities for redevelopment and recultivation
  • Development of concepts for redevelopment and recultivation
  • Expert consulting on ecological recultivation
  • Implementation of self-controlling measures
  • Interdisciplinary Research Work
  • Management of the Unstrut river basin area
  • Measurement of the soil-damp in root areas
  • Damp-measurement in salt-loaded matrices
  • Material release in soil substitutes
  • Methods of evaluating resist coatings
  • Soil water regime models for dumps and deposits
  • Bleicherode lysimeter station



Ramming core sounding to the sampling


Admission of a drillcore

Technology

  • State-of-the-art Drilling Equipment:
  • Ramming sounding equipment / drilling device RSB 0/1.4-88, Ramming core probes up to a ø 80 mm, Hollow bore corner ø 185 mm
  • Pneumatic hammers COBRA and BOSCH
  • Land Surveying:
  • In-clock reading plate loading test
  • Technology for registrating In - situ parameters (temperature, pH-value, conductivity, 02-content, redox tension)
  • Damp measurement technology, damp measuring probes ML2 and PR1 Tensiometer for direct regulation and logger operation
  • In. ltrometer (bed and ring-in. ltrometers and open-end-test)
  • Weather station (Thies Company)
  • Sampling Technology:
  • Equipment for soil sampling (RKS, sampling wells, Headspace)
  • Equipment for water sampling (various stainless steel scoops, sampling scoops for samples in deeper layers, various sampling pumps down to a maximum depth of 90 meters)
  • Equipment for soil air sampling (gas bags, gas mice, headspace, FID as direct measuring)



Drilling equipment during the investigation of refuse dumps


Drilling equipment in the field operation

References

  • Exploration of contaminated sites and preparatory measures for redevelopment on the factory grounds of the Rositz tarprocessing company and the disposal site ”Germania”
    UmweltministeriumThuringia/Germany
  • First evaluation of all saline deposits at the locations of the former combined enterprise Kombinat KALI
    Mitteldeutsche Kali AG/Germany
  • Systematic solutions for salt freight control and ecologically compatible salt freight regulation within the Thuringian river
    systems

    GVVmbH/Germany
  • Pilot project Bleicherode – Development of a recultivation process of contaminated dumps
    GVVmbH Erfurt and Deutsche Bundesstiftung Umwelt Osnabrück/Germany
  • Final report on the implementation of a lysimeter experiment on the Bleicherode potash dump
    Thüringer Landesanstalt für Landwirtschaft Jena/Germany
  • Preparation and consulting on the recultivation of the factory grounds of COTTANA Textil GmbH
    Stadtverwaltung Mühlhausen and Grundstücksgesellschaft zur Altlastensanierung – Mühlstraße, In
    der Klinge and Im Flarchen/Germany
  • Derivation of tolerable sulphate concentrations in flowing waters
    influenced by mining under ecological and economic aspects
    WISMUT GmbH/Germany
  • Survey on the compatibility with the environment of the project ”Erection of a biomass combined heat and power station in the
    business park of Siegerland-Airport” (research into animals and plants as protected property)

    TÜV Thüringen Anlagentechnik GmbH/Germany
  • Accompanying plan (landscape design) for repairing the dikes of Helderbach, Langenrodaer Bach, Wiehscher Bach and Nausitz Mühlgraben (creeks in Northern Thuringia)
    Staatliches Umweltamt Sondershausen/Deutschland
  • Ecological monitoring of the ”Freeing of the river Wipper from floodwater within the town of Sondershausen”
    GVVmbH and Staatliches Umweltamt Sondershausen/Germany
  • Production of managing tools for the water management under the conditions of saline entries within the drainage area of the
    upper and middle part of the river Unstrut
    Part 4 of a project: Explorations of the salt load entry of the area affected by 5 big potash residue dumps in the south of the Harz
    Mountains (material entries)

    Dresdner Grundwasserforschungszentrum e.V./Germany



river training of the river Wipper Sondershausen 26.04.2004


river training of the river Wipper Sondershausen 08.06.2004
created by: 3Kon GmbH Informationstechnologien