Technology of Backfilling

Services

  • Work out of concepts for backfilling and safekeeping for mine cavities filled with air or solution
  • Planning, basic engineering and project design of backfilling plants
  • Planning, coordination and realization of horizontal and vertical systems of barriers and dams in saline formations
  • Reconstruction and safekeeping of cavities and shafts filled with air or solution
  • Temporary and long term sealing of deep boreholes and caverns in saline formations
  • Supply at disposal of equipment and of specialists for backfilling, safekeeping and safety precautions



Application of the K-UTEC mixing equipment in the research mine Asse


Backfilling plant: Mixer with feeding of solid material and mixing fluid as well as the container for degassing with exhausting


Partial filled mine gallery in the research mine Asse


Backfilling of close to shaft cavities in the shaft Hattorf

References

  • Rehabilitation of mining damage situation on the south-west edge of the „Staßfurter Sattel“ by order of the DBU, Osnabrück in co-operation with Schachtbau Nordhausen GmbH and the university of Magdeburg, 1996 – 1998
  • Technical application of K-UTEC gel systems and high-strength building materials based on Sorel compounds for rehabilitation work and safekeeping in co-operation with the Schachtbau Nordhausen GmbH for the following shafts and mines by order of the country of Saxony-Anhalt:
  • Shaft Friedrichshall 2, Staßfurt, 1997
  • Shaft Brefeld I und II, 1998 to 1999
  • Shaft Alleringersleben near Morsleben, 2000
  • Shaft Samswegen, 2001
  • Shaft Friedrichshall I, Staßfurt, 2001
  • Erection of horizontal flow barriers and outlet sealings in the research mine Asse by order of the GSF, 1998 – 2004
  • Backfilling of the close to the shaft cavities in the shaft Hattorf with K-UTEC’s special building materials by order of the Kali und Salz GmbH, Plant Werra in co-operation with Schachtbau Nordhausen GmbH, 2001 – 2002
  • Planning for permission to build for erection of a plant for hydraulic viscous slurry    technique in the underground deposit Borth including the functional tendering/technical specification by order of the Trieneckens AG/RWE Umwelt AG, 2001 – 2002
  • Development of a basic concept for long term stable gallery dams in easy soluble salt rock  (Carnallite) for underground disposals and underground backfilling by order of BMBF; Working team under the management of the  GTS GmbH & Co. KG Teutschenthal
          Part 1: 2003 – 2004
          Part 2: 2004 – 2008
  • Sealing of the rock salt horizon at a thermal borehole in Bad Langensalza by order of the Angers Söhne GmbH, Hessisch-Lichtenau, 2005
  • Planning and basic engineering of a pilot plant for viscous slurry backfilling  by order of the GTS GmbH & Co. KG, Teutschenthal, 2005